Sr.No. |
Client
| Name of Work |
1 |
Specialized Engineering Services Pvt Ltd |
a. |
Construction of Eight lane Vadodara Kim Expressway from Km 323.00 to Km 355.00 (Sanpa to Padra Section of Vadodara Mumbai Expressway) in the State of Gujarat under NHDP Phase - VI on Hybrid Annuity mode (Phase IA-Package II). |
2 |
KCC Buildcon Private Limited |
a. |
Construction of Eight lane Carriageway starting near junction at SH-44 to Junction with Keshopura road (KM 115+700 to KM 151+840) Section of Delhi – Vadodara Greenfield Alignment (NH-148N) ON EPC mode under Bharatmala Pariyojana in the State of Rajasthan (Package V). |
b. |
Construction of Eight Lane Carriageway starting at Junction with Keshopura Road to Junction with NH-11 (Km 151+840 to Km 183+000) section of Delhi – Vadodara Green field Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan (Package-VI). |
c. |
Construction of Widening to 4 Lane Configuration of Champadanga-Pursura-Arambagh road section of SH2 in the district of Hooghly in West Bengal from 0.000km to 11.90km and 15.20km to 19.626km. |
d. |
Construction of Four lane Bangalore Chennai Expressway from Km 180.000 to Km 204.500 (Walajahpet to
Arakkonam Section in the State of Tamil Nadu) under Bharatmala on Hybrid Annuity Mode (Phase IIIPackage II). |
e. |
Construction of Four lane Bangalore Chennai Expressway from Km 53.500 to Km 71.000 Bangarpet to Bethamangala Section in the State of Karnataka under Bharatmala on Hybrid Annuity Mode (Phase I-Package III) |
f. |
Construction of four-lane Greenfield Delhi-Amritsar Katra Expressway from Jussur Kheri on KMP Expressway to Junction with Rohtak-Panipat road (NH-709) near Rukhi Paani village (Km 0+000 to Km 34+000) on Hybrid Annuity Mode under Bharatmala Pariyojna in the state of Haryana (Phase I-Package I) |
g. |
Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Jind-Panipat Road (NH-352A) near Gangana village to Junction with Jind-Karnal Road (NH-709A) near Alewa village (Km 60+800 to Km 91+400) on Hybrid Annuity Mode under Bharatmala Pariyojna in the state of Haryana (Phase I-Package III). |
h. |
Four Laning of Dhangaon – Borgaon section of NH 347BG and 753L under Bharatmala Pariyojana Phase
I in Madhya Pradesh - Package IV. |
3 |
Patel Infrastructure Limited |
a. |
Development of an Access-Controlled Six lane (Expandable to Eight lane) Greenfield Expressway from Meerut
to Prayagraj “Ganga Expressway” (Total Length- 593.947 Km) in the State of Uttar Pradesh on DBFOT (Toll)
basis Group-III (From Km. 289+300 (Village: Ubariya Khurd, Distt: Hardoi) To Km. 445+000 (Village: Sarso,
Distt: Unnao) Design length=155.700 Km) Package 7 (From Km. 289+300 To Km. 341+700 Design
length=50.400 Km)
|
b. |
Development of An Access-Controlled Six Lane (Expandable to Eight Lane) Greenfield “Ganga Expressway” [Group-Iii, From Km. 289+300 (Village: Ubariya Khurd. Dist. Hardoi) To Km. 445+000 (Village: Ubariya Sarso, Dist. Unnao), Design Length = 155.700 Km] In the State Of Uttar Pradesh On Dbfot (Toll) Basis Under Ppp” (Package-8: Km 341+700 To 391+900, 50.200 Km) |
c. |
Development of “Ganga Expressway” (Group-III) an Access- Controlled Six Lane (Expandable to Eight Lane) Greenfield Expressway from Meerut to Prayagraj from Km. 289+300 to Km. 445+000 (total design length 155+700 Km) in the State of Uttar Pradesh on DBFOT (Toll) Basis. |